| NEA/NEACRP/L(1975)121 | The NEA/Euratom Restricted Meeting of Specialists on Shielding Benchmark Experiments held at AEE, Winfrith; April 1975; Summary Report prepared for the NEA-CRP Meeting to be held at Bologna Butler, J. and McCraken, A.K. 9th-13th June 1975 |
| NEA/NEACRP/L(1975)122 | Breeding Performing of Carbide and Nitride Fuels in 5000 MWth LMFBRs |
| NEA/NEACRP/L(1975)123 | Measurement of the Breeding Ratio and Its Components in ZPPR Assembly 4 Phase I |
| NEA/NEACRP/L(1975)124 | ZPPR Assembly 3 Control Rod Worth Measurements Simons, G.G. |
| NEA/NEACRP/L(1975)125 | Streaming and Leakage Problems in Fast Reactors Langlet, G. and Khairallah, A. 6th June 1975 |
| NEA/NEACRP/L(1975)127 | Neutron Streaming in Fast Critical Assemblies Wade, D.C. and Gelbard, E.M. |
| NEA/NEACRP/L(1975)128 | Analysis of Measurements in the Null Reactivity Zone in ZPR-9/25 and Comparisons with the SCHERZO 556 Medium |
| NEA/NEACRP/L(1975)129 | Comparison of Reaction Rate Ratio Measurements in ZPPR and in ZEBRA Assembly 12 (MZB) Collins, P.J. and Beck, C.L. |
| NEA/NEACRP/L(1975)130 | Time-Dependent Generalized Perturbation Methods for Burn-Up Analysis Gandini, A. |
| NEA/NEACRP/L(1975)131 | Assessment Studies for Actinides Waste Schmidt, E. June 1975 |
| NEA/NEACRP/L(1975)132 | Actinide Fission Rate Measurements in ZEBRA 14 Sweet, D.W. 4th June 1975 |
| NEA/NEACRP/L(1975)133 | Cycle Design and Fuel Management for a PWR |
| NEA/NEACRP/L(1975)134 | The IBUS2-SELMA2 Fuel Management System (Risoe Report No. 310) Weber, S. September 1974 |
| NEA/NEACRP/L(1975)135 | Nuclear Blanket and Shielding Problems in Demonstration Fusion Reactors Casini, G. and Cuniberti, R. |
| NEA/NEACRP/L(1975)136 | Analysis of Fission Ratio Distribution in Spherical Lithium Metal Assembly with a Graphite Reflector Seki, Y., Maekaa, H., Moriyama, M., Hiraoka, T. and Hirota, J. |
| NEA/NEACRP/L(1975)137 | Calculation of Observable Streaming Effects in GCFR Lattices McCombie, C. June 1975 |
| NEA/NEACRP/L(1975)138 | 2D IAEA Benchmark Problem (DAEK-RP-3-75) Misfeldt, I. 4th June 1975 |
| NEA/NEACRP/L(1975)139 | 3D IAEA Benchmark Problem 2nd Order FEM Calculation (DAEK-RP-4-75) Misfeldt, I. 4th June 1975 |
| NEA/NEACRP/L(1975)140 | Fission-Neutron Spectra: Brief Review and Status of the Long-Standing Inconsistencies between Differential and Integral Data Fabry, A. |
| NEA/NEACRP/L(1975)141 | Experimental Determination of Integral Capture Cross-Sections of Structural Materials in Fast Spectra, Progress Report to April 1975 Tassan, S. 15th May 1975 |
| NEA/NEACRP/L(1975)142 | 3D IAEA Benchmark Problem 3rd Order FEM Calculation (DAEK-RP-5-75) Misfeldt, I. 6th June 1975 |
| NEA/NEACRP/L(1975)143 | A Fuel Management Study and Cycle Nuclear Design for PWR Reactors Minguez E. et Al. |
| NEA/NEACRP/L(1975)149 | Investigation of the Accuracy of Counterpoint, Cornerpoint and Finite Element Methods of the Diffusion Equation G.K. Kristiansen |
| NEA/NEACRP/L(1975)150 | Summary Report on the Specialists Meeting on Sensitivity Studies and Shielding Benchmarks October 1975 |
| NEA/NEACRP/L(1975)151 | PWR Benchmark Specifications Hehn & Koban |
| NEA/NEACRP/L(1975)152 | Fast Reactor Shielding Benchmark J.Y. Barre |
| NEA/NEACRP/L(1975)153 | Technical Minutes of 18th Meeting of the Committee Bologna (Italy) 9 - 13 June 1975 |