OECD Nuclear Energy Agency / L'Agence pour l'énergie nucléaire OECD-OCDE

Index to unrestricted Documents for 1975

NEA/NEACRP/L(1975)121The NEA/Euratom Restricted Meeting of Specialists on Shielding Benchmark Experiments held at AEE, Winfrith; April 1975; Summary Report prepared for the NEA-CRP Meeting to be held at Bologna
Butler, J. and McCraken, A.K.
9th-13th June 1975
NEA/NEACRP/L(1975)122Breeding Performing of Carbide and Nitride Fuels in 5000 MWth LMFBRs
NEA/NEACRP/L(1975)123Measurement of the Breeding Ratio and Its Components in ZPPR Assembly 4 Phase I
NEA/NEACRP/L(1975)124ZPPR Assembly 3 Control Rod Worth Measurements
Simons, G.G.
NEA/NEACRP/L(1975)125Streaming and Leakage Problems in Fast Reactors
Langlet, G. and Khairallah, A.
6th June 1975
NEA/NEACRP/L(1975)127Neutron Streaming in Fast Critical Assemblies
Wade, D.C. and Gelbard, E.M.
NEA/NEACRP/L(1975)128Analysis of Measurements in the Null Reactivity Zone in ZPR-9/25 and Comparisons with the SCHERZO 556 Medium
NEA/NEACRP/L(1975)129Comparison of Reaction Rate Ratio Measurements in ZPPR and in ZEBRA Assembly 12 (MZB)
Collins, P.J. and Beck, C.L.
NEA/NEACRP/L(1975)130Time-Dependent Generalized Perturbation Methods for Burn-Up Analysis
Gandini, A.
NEA/NEACRP/L(1975)131Assessment Studies for Actinides Waste
Schmidt, E.
June 1975
NEA/NEACRP/L(1975)132Actinide Fission Rate Measurements in ZEBRA 14
Sweet, D.W.
4th June 1975
NEA/NEACRP/L(1975)133Cycle Design and Fuel Management for a PWR
NEA/NEACRP/L(1975)134The IBUS2-SELMA2 Fuel Management System (Risoe Report No. 310)
Weber, S.
September 1974
NEA/NEACRP/L(1975)135Nuclear Blanket and Shielding Problems in Demonstration Fusion Reactors
Casini, G. and Cuniberti, R.
NEA/NEACRP/L(1975)136Analysis of Fission Ratio Distribution in Spherical Lithium Metal Assembly with a Graphite Reflector
Seki, Y., Maekaa, H., Moriyama, M., Hiraoka, T. and Hirota, J.
NEA/NEACRP/L(1975)137Calculation of Observable Streaming Effects in GCFR Lattices
McCombie, C.
June 1975
NEA/NEACRP/L(1975)1382D IAEA Benchmark Problem (DAEK-RP-3-75)
Misfeldt, I.
4th June 1975
NEA/NEACRP/L(1975)1393D IAEA Benchmark Problem 2nd Order FEM Calculation (DAEK-RP-4-75)
Misfeldt, I.
4th June 1975
NEA/NEACRP/L(1975)140Fission-Neutron Spectra: Brief Review and Status of the Long-Standing Inconsistencies between Differential and Integral Data
Fabry, A.
NEA/NEACRP/L(1975)141Experimental Determination of Integral Capture Cross-Sections of Structural Materials in Fast Spectra, Progress Report to April 1975
Tassan, S.
15th May 1975
NEA/NEACRP/L(1975)1423D IAEA Benchmark Problem 3rd Order FEM Calculation (DAEK-RP-5-75)
Misfeldt, I.
6th June 1975
NEA/NEACRP/L(1975)143A Fuel Management Study and Cycle Nuclear Design for PWR Reactors
Minguez E. et Al.
NEA/NEACRP/L(1975)149Investigation of the Accuracy of Counterpoint, Cornerpoint and Finite Element Methods of the Diffusion Equation
G.K. Kristiansen
NEA/NEACRP/L(1975)150Summary Report on the Specialists Meeting on Sensitivity Studies and Shielding Benchmarks
October 1975
NEA/NEACRP/L(1975)151PWR Benchmark Specifications
Hehn & Koban
NEA/NEACRP/L(1975)152Fast Reactor Shielding Benchmark
J.Y. Barre
NEA/NEACRP/L(1975)153Technical Minutes of 18th Meeting of the Committee Bologna (Italy)
9 - 13 June 1975

No documents available at this time