1.       Koning proposed to check the Ti files for MF=6 and take an action for NRG to resolve the problems TALYS could have.

2.       Koning will study the possibility to include 6 neutron delayed groups data in the comments file.

3.       Koning will ask Los Alamos for thermal benchmark inputs.

4.       New U-238 file, Sublet will include the data for the neutron leakage from the ENDFB/VII evaluation.

5.       NEA Secretariat received the new Ti files from IRK evaluations (EFFDOC-911) and it should be reconstructed and included in JEF3.1T1

6.       Action upon NRG and CEA to resolve the problem that Pb files were processed from last version of NRG.

7.       Be-9: Sublet proposed to have ready the new evaluation for discussions with Trkov and the other reviewers.

8.      Sublet to put in contact the NEA Secretariat with people who could do benchmarking at IRSN

9.      Action on Courcelle to urge ORNL to send U-238 Macklin data to NNDC/NEA for EXFOR.

Actions on-going

10.   Dean provided the information from the IAEA progress. Trkov commented that he is looking at the data and making a kind of ENSDF file (IGA lib). The work is still on-going. The data will be analysed and reviewed.

11.   Feedback pages on the NEA website for JEFF3.0 are being updated although most of the proposals are included in JEFF3.1. NEA will open a feedback list for JEFF3.1T.

12.   NEA will include the 8 delayed groups structure for delayed neutron yields before February 15th; the action is on-going.

13.   Serot and Courcelle need to check if they are going to retain the changes to the fission components in the new JEFF3.1; the action on-going.

14.   IAEA have the document for Fe-58 available on the web site. The action is on-going and they expect to be finished before the end of January, together with photon data.

15.   The work is in progress and during the meeting a presentation will propose a solution, and if it is accepted a new Am-241 file will be in JEFF3.1.


 

List of actions he previou EFF meeting

 

1.      (Sublet/Fischer): Preparation of the Be-9 file for JEFF-3.1. Solve problems with the covariances. No photo-production data is available in MF6 of JEFF-3.0 or JEFF-3.1. Needs also to be done.

 

2.      (NEA/Batistoni): The inclusion of Poland as part of the EFF/EAF work was welcomed. Researchers need to be added to the mailing lists. A list of new contacts needs to be distributed.