CSNI0062 BETHSY/9.1B. (Abstract last modified 01-MAR-1990)
1.
NAME OR DESIGNATION - BETHSY/9.1B. 2.
COMPUTER FOR WHICH PROGRAM IS DESIGNED AND OTHER MACHINE VERSION PACKAGES AVAILABLE -
To request or retrieve programs click on the one of the active versions below.
A password and special authorization is required. Explanation of the status codes.
Machines used:
Package-ID Orig.Computer Test Computer
CSNI0062/01
3.
TEST FACILITY - 4.
TEST - 6.
PHENOMENA TESTED - 9.
STATUS 10.
REFERENCES - 11.
TEST DESIGNATION - 9.1B 12.
PROGRAMMING LANGUAGE(S) USED - 15.
ESTABLISHMENT - 16.
MATERIAL AVAILABLE - 17.
CATEGORIES - Keywords: DATA, LOSS-OF-COOLANT ACCIDENT, TRANSIENTS
Program-name Package-ID Status
BETHSY/9.1B CSNI0062/01 Report
The BETHSY integral test facility located in the Nuclear Research Center in Grenoble (France) is a scaled down model of a 3 loop 900 eMW FRAMATOME PWR; the overall scaling factor applied to every volume, mass flowrate and power level is close to 1/100, while elevations are 1/1 in order to preserve the gravitational heads.
The BETHSY test 9.1b (performed in December 1989) involves 2" cold leg break, combined with the High Pressure Injection System (HPIS) failure. In that case, the state oriented approach requires operators to start an Ultimate Procedure, which consists in fully opening the Steam Generator (SG) atmospheric dumps as soon as they are informed of the unavailability of the HPIS. The presently studied scenario assumes a delayed application of this procedure, which is started only when the core outlet temperature rises significantly higher than the saturation temperature.
The BETHSY program aims to contribute to validating CATHARE safety code and to check the relevance of the physical bases of the Emergency Operating Procedures (EOP).
Test 9.1b addresses, besides typical problems relevant to Small Break Loss Of Coolant Accidents (SBLOCA) such as critical 2-phase flow, loop seal clearing, heat-transfer during boil-off or accumulator injection, specific aspects related to the fast depressurization (primary to secondary and structural heat transfer), uncovered core behavior when intense condensation takes place in the SG, and primary side refilling by the Low Pressure Injection System (LPIS).
CSNI0062/01: 01-MAR-1990 Report Only
CSNI0062/01:
- OECD/NEA/CSNI International Standard Problem No.27
BETHSY Experiment 9.1B 2" Cold Leg Break without HPSI and with
Delayed Ultimate Procedure
Comparison Report Volume 1 and 2 (NEA/CSNI/R(R92)20) November 1992
- BETHSY General Description
Note SETh/LES/90-97 (Avril 1990)
- Ph. Gully and R. Deruaz
BETHSY Measurement System
Note SETh/LES/87-27 (Oct. 87)
- BETHSY Measurement System
Up-dating (April 1990) of report SETh/LES/87-27
- P. Bazin:
BETHSY: Data Base
Note SETh/LES/87-28 (Mars 1988)
CSNI0062/01:
Programme sponsored by:
the Commissariat a l'Energie Atomique
Electricite de France
Framatome
CSNI0062/01:
- Y. Integral Experiments Data, Databases, Benchmarks
Home - About Us - Work Areas - Data Bank - Publications - Press Room - List of acronyms - Search