CSNI0057 FIST/6IB1. (Abstract last modified 18-JAN-1993)
1.
NAME OR DESIGNATION - FIST/6IB1. 2.
COMPUTER FOR WHICH PROGRAM IS DESIGNED AND OTHER MACHINE VERSION PACKAGES AVAILABLE -
To request or retrieve programs click on the one of the active versions below.
A password and special authorization is required. Explanation of the status codes.
Machines used:
Package-ID Orig.Computer Test Computer
CSNI0057/01 Many Computers
3.
DESCRIPTION OF TEST FACILITY - BWR/6-218 standard plant. A full size bundle with electrically heated rods is used to simulate the reactor core. A scaling ratio of 1/624 is applied in the design of the system components. Key features of the FIST facility include: (1) Full height test vessel and internals; (2) correctly scaled fluid volume distribution; (3) simulation of ECCS, S/RV, and ADS; (4) level trip capability; (5) heated feedwater supply system, which provides the capability fo steady state operation. 4.
DESCRIPTION OF TEST - Test 6IB1 investigates system responses to an intermediate break in the recirculation suction line. BWR system licensing evaluations for various size recirculation break LOCA's indicates that a break size of about 0.2 sq.ft., without LPCS operation, is the highest PCT case for the intermediate break LOCA. Test 6IB1 simulates this event. 5.
EXPERIMENTAL LIMITATIONS OR SHORTCOMINGS - 6.
PHENOMENA TESTED - distribution; core heat transfer including DNB, dryout, RNB, surface to surface radiation; quench front propagation for both fuel rods and channel walls; separator behaviour including flooding, steam penetration and carryover; phase separation and mixture level behaviour; guide tube and lower plenum flashing; natural circulation in core and downcomer; mixture level in core. 7.
SPECIAL FEATURES OF EXPERIMENT - 8.
COUNTERPART EXPERIMENTS - 9.
STATUS 10.
REFERENCES - 11.
TEST DESIGNATION - 6IB1 12.
PROGRAMMING LANGUAGE(S) USED - 15.
ESTABLISHMENT - 16.
MATERIAL AVAILABLE - 17.
CATEGORIES - Keywords: DATA
Program-name Package-ID Status
FIST/6IB1 CSNI0057/01 Arrived
CSNI0057/01: 18-JAN-1993 Arrived at NEADB
CSNI0057/01:
- W.S. Hwang, Md.Alamgir and W.A. Sutherland:
BWR Full Integral Simulation Test (FIST) Phase I Test Results
NUREG/CR-3711, November 1983
- W.A. Sutherland, Md.Alamgir, J.A. Findlay, W.S. Hwang:
BWR Full Integral Simulation Test (FIST) Phase II Test Results and
TRAC-BWR Model Qualification
NUREG/CR-4128, June 1985
CSNI0057/01:
Work sponsored by: U.S. Nuclear Regulatory Commission
Electric Power Research Institute
General Electric Company
CSNI0057/01:
Directory (TOTAL: 175.1 MB)
Currents 0.3 MB
Densities 0.5 MB
Flows 0.5 MB
Levels 4.8 MB
Differential Pressures 14.4 MB
Pressures 1.4 MB
Powers 1.7 MB
Rotational Soeed (Pump) 0.3 MB
Temperatures 24.4 MB
Voltages 2.0 MB
Computed Parameters 124.6 MB
- Y. Integral Experiments Data, Databases, Benchmarks
Home - About Us - Work Areas - Data Bank - Publications - Press Room - List of acronyms - Search