CSNI0050 FIX-II/3061. (Abstract last modified 23-SEP-1992)
1.
NAME OR DESIGNATION - FIX-II/3061. 2.
COMPUTER FOR WHICH PROGRAM IS DESIGNED AND OTHER MACHINE VERSION PACKAGES AVAILABLE -
To request or retrieve programs click on the one of the active versions below.
A password and special authorization is required. Explanation of the status codes.
Machines used:
Package-ID Orig.Computer Test Computer
CSNI0050/01 Many Computers
3.
DESCRIPTION OF TEST FACILITY - The FIX-II facility is a volume scaled 1:777 representation of a Swedish BWR with external pumps. The pressure vessel contains a 36 rod full length bundle and a spray condenser at the top to allow steady state operation. The downcomer, bypass channels and guide tube volumes are represented by external piping. The intact loop represents three of the four external reactor loops. The broken loop is constructed such that both guillotine breaks and split breaks may be simulated. The facility is equipped with ADS-simulation, but no ECCS injection are included. The FIX-II loop is also suited to investigate response of pump trips and MSIV closures in internal pump reactors. 4.
DESCRIPTION OF TEST - Test No. 3061 is a simulated large split break. The break area was equal to the scaled down are of one of the four recirculation pipes in the reactor (100 %). The initial power should be equivalent to the average bundle power of the reactor and became here 2.51 MW, i.e. slightly higher. 5.
EXPERIMENTAL LIMITATIONS OR SHORTCOMINGS - 6.
PHENOMENA TESTED - Collapsed level behaviour in downcomer; core thermal hydraulics; void collapse and temperature distribution during pressurization; critical power ratio. 7.
SPECIAL FEATURES OF EXPERIMENT - 8.
COUNTERPART EXPERIMENTS - 9.
STATUS 10.
REFERENCES - 11.
TEST DESIGNATION - 3061 12.
PROGRAMMING LANGUAGE(S) USED - 15.
ESTABLISHMENT - 16.
MATERIAL AVAILABLE - 17.
CATEGORIES - Keywords: DATA, PUMPS, TRANSIENTS
Program-name Package-ID Status
FIX-II/3061 CSNI0050/01 Arrived
CSNI0050/01: 23-SEP-1992 Arrived at NEADB
- L. Nilsson, et. al.:
FIX-II LOCA Blowdown and Pump Trip Heat Transfer Experiments,
Experimental Results from Pump Trip Experiments of Test Groups
Nos. 1, 2, 8 (STUDSVIK/NR-83/324)
CSNI0050/01:
- Lars NILSSON et al:
FIX-II - LOCA Blowdown And Pump Trip Heat Transfer Experiments
Experimental results from LOCA test No. 3061 (STUDSVIK/NR-84/487, 1984)
- L. Nilsson, P.-A. Gustavsson:
FIX-II LOCA Blowdown and Pump Trip Heat Transfer Experiments,
Description of Experimental Equipment, Part 1, 2 and 3
(STUDSVIK/NR-83/238, February 1983)
- L. Nilsson, et. al.:
FIX-II LOCA Blowdown and Pump Trip Heat Transfer Experiments,
Topical Report of Phase 4:
Results of Static Dryout Measurements in the 36-Rod Bundle
(STUDSVIK/NR-83/274, 1983)
- L. Nilsson:
FIX-II LOCA Blowdown and Pump Trip Heat Transfer Experiments
Summary Report for the second experimental period (STUDSVIK/NR-85/42)
- R. Persson, L. Nilsson and L. Gustafson:
FIX-II Transient Dryout Tests
Summary Report (STUDSVIK/NP-86/35, March 1986)
- J. Eriksson:
ICAP, Assessment of RELAP5/MOD2, Cycle 36.04 against FIX-II
Guillotine Break Experiment No 5061 (STUDSVIK/NP-86/109, October 1986)
- L. Nilsson:
Transfer of data from FIX-II experiments to OECD/NEA's Databank
for the CSNI Code Validation Matrix (NS-92/58, September 1992)
CSNI0050/01:
Lars NILSSON, Lennart GUSTAFSON, Alf PETTERSSON, Bo STROEM
Swedish Nuclear Power Inspectorate
CSNI0050/01:
FIX-II LOCA test 3061 results
- Y. Integral Experiments Data, Databases, Benchmarks
Home - About Us - Work Areas - Data Bank - Publications - Press Room - List of acronyms - Search